skip to main
|
skip to sidebar
Muiderbrug Renovation
Sunday, 31 May 2009
Prefab segments being installed
After the compression beam was installed, the prefabricated concrete elements of the pylon were put on top of the bottom part of the column. The bottom part was cast in situ.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
▼
2009
(6)
►
June
(3)
▼
May
(2)
Prefab segments being installed
Erection of cable stay construction has been started
►
April
(1)
About Me
Hans
View my complete profile
No comments:
Post a Comment